Safety
General
This manual contains important instructions for the inverter that must be followed during
installation and maintenance of the inverter.
The inverter is designed and tested according to international safety requirements. Due
to its electrical and electronic components, certain precautions must be taken when
installing and operating the inverter.
In order to reduce the risk of injury to persons and to ensure safe installation and opera-
tion of the inverter, be sure to read these Operating Instructions carefully and follow all
instructions and safety instructions.
Failure to observe the Operating Instructions and safety instructions can void the war-
ranty and/or cause damage to the inverters or other property damage!
Electrical installa-
tions
All electrical installations must be carried out in accordance with the National Electrical
Code, ANSI/NFPA 70, and any other codes and regulations applicable to the installation
site.
For installations in Canada, the installations must be done in accordance with applicable
Canadian standards.
Rapid shutdown
The
rapid shutdown (RSD)
can be triggered via
loss of the grid connection
: If the AC
connection is lost, a rapid shutdown can be performed automatically. The inverter detects
a loss of the AC connection and the lines are discharged to < 30 V
DC
/ 8 A / 240 VA and
< 15 V
AC
/ 8 A / 240 VA. The inverter also interrupts the communication to the PV mod-
ules if they comply with the SunSpec standard for Rapid Shutdown.
In case a module-level shutdown equipment within the PV array is used in combination
with the inverter, this labeling has to be used according to NEC (Section 690.12), CEC
(64-218):
SOLAR PV SYSTEM IS EQUIPPED
WITH RAPID SHUTDOWN.
TURN RAPID SHUTDOWN SWITCH TO
THE „OFF“ POSITION TO SHUT DOWN
PV SYSTEM AND REDUCE SHOCK
HAZARD IN ARRAY.
SOLAR ELECTRIC
PV PANELS
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
In case a string-level shutdown equipment at the PV array is used in combination with
the inverter, this labeling has to be used according to NEC (Section 690.12), CEC
(64-218).
5
EN-US
Summary of Contents for 10.0-3 208-240
Page 2: ......
Page 13: ...Preparation 13...
Page 14: ...14...
Page 20: ...1 2 20...
Page 21: ...AC 21...
Page 22: ...22...
Page 31: ...DC 31...
Page 32: ...32...
Page 41: ...Laying Solar Net Cables 41...
Page 42: ...42...
Page 43: ...Data communication Lay data commu nication cables 1 2 3 4 5 22 lbf in 2 5 Nm 6 43 EN US...
Page 45: ...1 2 1 3 TX20 10 6 lbf in 1 2 Nm 1 2 4 5 45 EN US...
Page 46: ...46...
Page 47: ...Finally 47...
Page 48: ...48...
Page 51: ...4 3 in 1 ON OFF Lock 22 1 lbf in 2 5 Nm 2 3 4 51 EN US...
Page 52: ...22 1 lbf in 2 5 Nm 5 6 AC ON 2 ON OFF Lock 1 7 52...
Page 55: ...Options 55...
Page 56: ...56...
Page 62: ...62...
Page 63: ...Care and maintenance 63...
Page 64: ...64...
Page 66: ...66...
Page 67: ...67 EN US...