6.1 Maintenance work by the operator
❒
Regular maintenance of the discharge extends the service life of the entire plant
and is a basic requirement for trouble-free operation!
2
4
5
3
1
7
8
11
10
9
6
W
M
Q
F
W
M
Q
F
W = weekly, M = monthly, Q = quarterly, F = prior to each fill of the store
No.
Component
Int.
Operation
1
Motor / gears
W
❒
Carry out a general visual inspection of the drive
motor
➥
No major oil leaks should be visible.
2
Gravity shaft / safety
switch
M
Function test of the safety switch:
❒
Open the inspection cover of the gravity shaft
➥
The system should switch off immediately.
❒
Check the inlet area for material build-up and clean
where necessary.
❒
Close gravity shaft cover
❒
Check fault message on the controller
3
Sprinkler system
Sprinkler system ready for operation
❒
Check the position of the sensor
❒
Visual inspection of the sensor and the capillary
tube
❒
Check water supply for sufficient pressure
4
Spring piles
F
❒
Check that the connecting screws of the clamping
plate are firmly in position and tighten if necessary
➥
Replace broken screws immediately
❒
Check that the connections of the spring piles have
a little play (approx. 1mm)
➥
Tighten or loosen the screws if necessary
5
Clamping plate of the
spring piles
❒
Check that the screws of the clamping plate are
firmly in position and tighten if necessary
6
Servicing the system
Maintenance work by the operator
42
Fröling Ges.m.b.H. | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com