Final Unit Installation Overview
Unit Final Placement - Front Install
1)
Ensure that power if off at the junction box feeding power to the air conditioner until all process steps are
completed.
2)
Move the unit from the shipping base and onto the installation site.
3)
Insert the unit’s rear extension into the wall plenum. There should be approximately 2” of penetration of the
unit into the wall plenum, resulting in a complete seal all around.
4)
Identify the appropriate drain port to use and complete plumbing (See Page 22).
5)
Attach the ductwork to the unit at the supply-air outlet and ensure the seal is air tight (See Page 23).
6)
Wire and connect the wall controller (See Pages 24-27).
7)
Connect the main power (See Page 28).
INSTALLATION
Final Unit Installation Overview
Summary of Contents for VRP12K
Page 46: ...46 OPERATION Component Identification Indoor Coil 36k ...
Page 48: ...48 OPERATION Component Identification Outdoor Coil Monitored by 1 thermistor ...
Page 49: ...49 OPERATION Component Identification Outdoor Fan BLDC Variable Speed 600 1000 RPM ...
Page 53: ...53 OPERATION Component Identification 4 Way Reversing Valve 208 230v Reversing valve assembly ...
Page 177: ...177 UPDATING VRP FIRMWARE Or ...
Page 184: ...184 UPDATING VRP FIRMWARE Open zip file Copy to SD Card Insert into SD Card Slot ...
Page 193: ...193 UPDATING VRP FIRMWARE Retrieving VRP Data Remove SD Card from FMC and Locate DF Folder ...
Page 196: ...196 WIRINGDIAGRAMS 12 24K BTU 208 230V 7 5 10 0 KW Figure 801 Wiring Diagram ...
Page 197: ...197 WIRING DIAGRAMS 12 24K BTU 208 230V 2 5 3 4 5 0 KW Figure 802 Wiring Diagram ...
Page 198: ...198 WIRING DIAGRAMS 12 24K BTU 265V 2 5 3 4 5 0 kW Figure 803 Wiring Diagram ...
Page 199: ...199 WIRING DIAGRAMS 12 24K BTU 265V 7 5 10 kW Figure 804 Wiring Diagram ...
Page 200: ...200 WIRING DIAGRAMS 36K BTU 208 230V Figure 805 Wiring Diagram ...