FRIEDLAND SPECTRA 140 Instruction Manual Download Page 1

Instruction Manual

BEFORE STARTING ANY 

INSTALLATION WORK, 

PLEASE READ CAREFULLY

List Numbers L210S BLK / L210S WHI

ENG

SAFETY

Always follow the manufacturers advice when using

power tools, steps, ladders etc. and wear suitable

protective equipment (e.g. safety goggles when

drilling holes).  Before drilling holes in walls, check for

hidden electricity cables and water pipes, the use of a

cable/pipe locater maybe advisable if in doubt.

The mains supply to this product should be installed

by a competent person (e.g. a qualified electrician)

in accordance with these instructions and in

accordance with the appropriate clauses of the current

edition of the IEE wiring regulations (BS7671).

DANGER - 240 VOLTS. To prevent the risk of

electrocution, always turn off the mains electricity

supply before commencing any work on the installation

or opening the detector.

It is essential that all connections are made as

instructed, that cables are not stressed and that

terminals are fully tightened.

TOOLS NEEDED

Drill and 6mm Masonry Drill Bit

Wire cutters and Wire Strippers

No.2 Philips Screwdriver

Terminal or Electricians Screwdriver

Large Bladed Screwdriver

1

L210S 6017 ENG 1-10  8/15/06  10:10 AM  Page 3

Summary of Contents for SPECTRA 140

Page 1: ...t person e g a qualified electrician in accordance with these instructions and in accordance with the appropriate clauses of the current edition of the IEE wiring regulations BS7671 DANGER 240 VOLTS T...

Page 2: ...Fig 3 So if possible mount the PIR facing ACROSS the approach to your property Fig 1 Fig 2 Fig 3 False activation reduction technology makes your PIR Detector less prone to activation by wind rain mov...

Page 3: ...drill the holes to the required depth and insert the wall plugs Cabling can either be from directly behind the unit through the wall or along the surface from below via the gaps provided in the housi...

Page 4: ...It is suggested that 3 core round flexible cable of at least 1mm2 gauge is used It is also allowable for the unit to be connected to the domestic socket ring main though it is suggested that a 5 amp f...

Page 5: ...TH NEUTRAL OPERATION 4TESTING Walk Testing When the installation procedure is complete the unit is ready for testing The Walk Test procedure is as follows Step 1 Set the two adjustment controls on the...

Page 6: ...to establish the detection pattern Step 6 If the detection area is too small for your requirements try angling the sensor head up This should increase the coverage distance Similarly angling the head...

Page 7: ...s giving a total ON time of 3 minutes all timings are approximate Step 2 The LUX control determines the level of darkness required for the unit to start operating each evening The setting is best achi...

Page 8: ...ee Section 4 for details Ambient light level may be too low in operational area During daylight turn the LUX control slightly anti clockwise When lamp extinguishes enter detection area if PIR still ac...

Page 9: ...onds 15 minutes Lux Level Adjustment Day night or night only operation Environmental Protection IP44 Suitable for outdoor use The PIR sensor emits no radiation is not harmful to people animals or plan...

Page 10: ...arantee will be invalidated The guarantee states Novar ED S entire liability It does not extend to cover consequential loss or damage or installation costs arising from the defective product This guar...

Reviews: