Frico Aquaztrip H Service & Maintenance Download Page 3

Service & maintenance

1.4.1 When using push-on fittings

 

Please ensure that all pipes and fittings are undamaged, as even small dents and 
scratches potentially pose a risk of leakage in the system. Always remember to do 
a pressure test after assembly of the pipe work.

 

Both flow and return pipe is covered by a plastic or rubber protection cover, which 
should be removed before installation.

After removing the protection cover, make sure that the pipe is intact and undamaged, 
especially at the pipe end. Crocked or in other ways imperfect pipe ends will result 
in leaks. Deburr the pipe on the inside and the outside, using a deburring tool before 
installation 

 

Mount a push-on fitting to the pipe. Make sure to press the fitting all the way onto 
the pipe. Consult the installation guide for the specific fitting for further details on 
proper installation.

Push-on fitting

3

Aquaztrip H, L, P

Summary of Contents for Aquaztrip H

Page 1: ...Aquaztrip H L P Service maintenance Original instructions...

Page 2: ...Do not lift in edges Each panel is equipped with protective film to avoid any damage during transport and handling at building site The film needs to be removed before commissioning the products 1 3...

Page 3: ...r which should be removed before installation After removing the protection cover make sure that the pipe is intact and undamaged especially at the pipe end Crocked or in other ways imperfect pipe end...

Page 4: ...ipe will be exposed to a big amount of force creating a risk of crushing the pipe To ensure that the pipe won t be crushed when mounting the compression fitting a copper insert should be inserted into...

Page 5: ...el Always support the connecting pipe when inserting the copper insert into position Mount a compression coupling and or a valve to the pipe Don t stress the nut too much since this may crush the pipe...

Page 6: ...efore installation Mount a push on fitting to the pipe Make sure to press the fitting all the way onto the pipe After mounting the push on fitting mount the flexible hose Make sure that the flexible h...

Page 7: ...ater connection Label location interior Under insulation above water connection On the label you ll find Order Order identification number Product Product configuration Project Project name Order nr P...

Page 8: ...kg m 2 1 3 0 5 4 7 5 Water content l m 0 4 0 8 1 2 1 6 Copper pipes quality EN12735 2 CU DHP Linear exp Panel overtemp 0 024 mm m K 4 2 Environmental declaration Please visit www frico net 4 3 Workin...

Page 9: ...prevent corrosion The water system must be filled with potable water that complies with the EC directive 98 83 EC pH value of water must be between approximately 6 9 pH The water velocities should not...

Page 10: ...ste produktuppdateringarna montageanvisningarna samt support tel e mail www frico se R tt till ndringar f rbeh lles FI T lt l yd t uusimmat tuotetiedot ja asennusohjeet sek tuotetuen yhteystiedot www...

Reviews: