INSTALLATION
INSTALLATION
LOCATION
Immediately after unpacking the merchandiser, check for possible shipping damage. If the
merchandiser is found to be damaged, save the packaging material and contact the carrier
within 15 days of delivery. Prior to installation, test the electrical service to assure that it
agrees with the specifications on the machine data plate located on the right side panel near
the controls.
The merchandiser must be installed on a level surface. The installation location must allow
adequate clearances for servicing and proper operation.
The connecting cable for the unit must be equipped with an approved plug connection. If
use is to be made of a permanent connection, the connecting cable must be connected to a
manual on/off switch that is installed near the unit in a clear visible manner.
INSTALLATION
The minimum temperature of the environment should be 20°C for the Multi Deck 60/100/120
hot. The maximum temperature of the environment should be 22°C and the relative humi-
dity should be maximum 65%.
Note:
Strong air-currents due to draughty doors, air-conditioninig outlets etc. will be detri-
mental to the proper operation.
Note:
The minimum temperature of the hot products that are loaded inside the Multi Deck
must be 85°C.
Note:
The maximum load per shelf is 20 kg. The load must be equally distributed over the
shelf.
GENERAL