background image

 

24 

 

 

 

9. Installation drawing 

 

 

 

 

Summary of Contents for LDR 8 s AC

Page 1: ...ntended to be all encompassing If you have not attended a training for this product you should read in its entirety the repair install procedure you wish to perform to determine if you have the necess...

Page 2: ...S MANUAL IN A SAFE PLACE FOR FUTURE USE FOR YOUR SAFETY Do not store or use gasoline or other Flammable vapors and liquids in the vicinity of this appliance WARNING Improper installation adjustment al...

Page 3: ...4 1 Technical description 10 4 2 Intended use 10 5 Installation and first use 11 5 1 Unpacking the rotisserie 11 5 2 Installation and positioning 11 5 3 Electrical supply 14 5 4 Gas connection 16 5 4...

Page 4: ...s 800 363 kg Net lbs 690 312 kg Maximum ambient temperature F 95 Sound pressure dB A 70 Electrical installation Voltage V 1 208 Frequency Hz 50 60 Required power kW 0 9 Max nominal current A 4 4 Plug...

Page 5: ...ls available during installation Standard set of tools Metric wrenches sockets and hex socket key wrenches Multi meter AC current clamp tester Temperature tester Insulation value tester Megger Gas pre...

Page 6: ...ne and contains the following data Name of the supplier or the manufacturer Model Serial number Year of construction Country of destination Kind of gas Gas pressure Included gas power Mains voltage Fr...

Page 7: ...isk of slippery floor Spills may cause slippery surfaces clean up promptly WARNING See installation instructions for grounding requirements WARNING Always use the brakes on both front wheels 3 4 1Gene...

Page 8: ...g When moving the rotisserie Before moving the rotisserie first switch off the mains voltage by pulling the plug from the wall socket and empty the fat collecting container After that cool down the ro...

Page 9: ...s supply Clean the rotisserie thoroughly Wrap the rotisserie from getting dusty Store when applicable the rotisserie in a dry non condensing environment 3 4 6Disposal Dispose of the machine any compon...

Page 10: ...erie fixed to level set by the operator The rotor is being wheeled by a maintenance free motor and gearbox The hardened glass panes are equipped with a heat reflecting layer to keep the heat inside th...

Page 11: ...and contact the transporter within fifteen working days after receiving the goods 5 1 Unpacking the rotisserie Single rotisserie shown 1 Unpack the rotisserie as initiated on the unpacking instructio...

Page 12: ...llowed WARNING Install the equipment in a sufficiently ventilated room in order to prevent concentrations of harmful substances in that room WARNING Always install the equipment under a ventilated coo...

Page 13: ...l shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of psi 3 5 kPa ii The appliance must be isolated from the...

Page 14: ...nduit Unpacking of the rotisserie Remove the pallet under the rotisserie with the help of a forklift Put the rotisserie on his location Check if there is enough free space around the rotisserie see in...

Page 15: ...For a 1 phase 208 V circuit with neutral the rotisserie must be connected according to the figure below A ground earth connection must be provided and installed in accordance with state and local cod...

Page 16: ...the gas line after leveling Gas supply line must be at least the equivalent of 1 2 12 7 mm iron pipe and capable of maintaining the required gas pressure during full power Make sure the pipes are clea...

Page 17: ...ressure meter like in the picture below Gas inlet Inlet of gas after gas pressure reduction valve max 22 H2O Pressure depending of gas type Gas outlet Outlet of gas into gas mixture blower Coils 2 Coi...

Page 18: ...opened yet you measure a under pressure due to the suction of the gas mixture blower and this pressure will be zero when the valve is opened 5 4 2Flue gas analyzer With the flue gas analyzer you can m...

Page 19: ...on the same gas line may be active 5 5 Power water and drain connections The power water and drain connections can be found at the back of the rotisserie 208 V USA modelsPower connection NEMA 6 15 P...

Page 20: ...non dissolved sediments Water hardness and descaling filters A descaling filter is advised when the hardness of the water is 4 dH 4 Grains Gal A descaling filter is mandatory when the hardness of the...

Page 21: ...on hood which has adequate connection to an exhaust duct and extends 8 beyond the rotisserie sides Clearance above the rotisserie flue should be adequate for the products to escape so that there is no...

Page 22: ...Smoke with an unpleasant odor will normally be given off during this burn in period 7 Instructions for operators After installation of the rotisserie the operator of the rotisserie has to be instructe...

Page 23: ...23 8 Electrical diagrams E dwg 9340801 circuit diagram...

Page 24: ...24 9 Installation drawing...

Reviews: