background image

2

Installation

Hot switch valve(Red)

O-ring

Plate washer

Fixing washer

Round screw

Fixing nut

Supply Lines

Three way connector

Faucet

Rubber washer

Cold switch valve (Blue)

Fit the rubber washer into the bottom groove of the faucet, place the faucet into the installing hole on the 

countertop.Place the plate washer and fixing washer under the countertop and revolve the fixing nut.Check that the 

faucet is correctly positioned,then tighten the round screw.Screw the three way connector(make sure a plate 

washer inside) onto the bottom thread of the faucet.

Install the supply lines attached hot switch valve (Red) and cold switch valve (Blue) into the installing hole on the 

countertop.Turn the hot switch valve in clockwise direction and cold switch valve in anticlockwise direction to off 

state.Place the plate washer and fixing washer under the countertop and revolve the fixing nut. Adjust the position 

of the two valves and keep the handle in the same direction as the diagram, tighten the round screw by the screw 

driver. 

Screw one end of the supply lines to the thread on the hot and cold switch valve. (See the above diagram)

Screw the other end of the supply lines to the thread on the three way connector.(See the above diagram)

1.

2.

3.

4.

Reviews: