background image

Page 7

SuperLoader 

(SuperLoader DLT and SuperLoader LTO) 

Quick Start Guide

Summary of Contents for LTO SUPERLOADER

Page 1: ...ors a utility knife or other appropriate tool carefully cut the packing tape along the length and ends of the carton c Remove the accessories box from the shipping carton The accessories box contains...

Page 2: ...m in back are required to facilitate component removal and installation The SuperLoader should be positioned away from cooling vents or exhaust from other devices to help minimize the amount of debris...

Page 3: ...ttach the support brackets correctly the side of the bracket with only two holes should be secured to the rail e With the help of a second installer insert the SuperLoader into the rack so that each S...

Page 4: ...ws to secure the cable connection d Attach the other end of the SCSI cable to the SCSI host adapter card e Complete the SCSI connection by doing one of the following If the SuperLoader is the last dev...

Page 5: ...to match the class of the local network or the SuperLoader must be reconfigured to accept dynamic IP addresses For more information refer to the User s Guide Step 8 Load Tape Cartridges The SuperLoade...

Page 6: ...the desired tape cartridge with one of the openings on the other side of the magazine Then using your thumb and index finger pull out the cartridge You will feel a little resistance as you begin to pu...

Page 7: ...Page 7 SuperLoader SuperLoader DLT and SuperLoader LTO Quick Start Guide...

Page 8: ...For more information visit our Web site Page 8 SuperLoader SuperLoader DLT and SuperLoader LTO Quick Start Guide 81 60222 15 A01 6707947 02cN 02...

Reviews: