Operation and Maintenance Manual, OnyX Sky Heat Recovery Units, 2022/01
Frapol Sp. z o.o. reserves the right to introduce changes without any prior notice.
Page
69
Equipment Handover Report
Customer:
Name and address of the facility:
Type and size of the unit:
Factory No. of the unit:
Delivery date:
Assembly and Commissioning
Work
Name and address of the company
carrying out the work
Date and
signature
Comments
Assembly and installation
Electrical connections
Hydraulic connections
(e.g. connecting a drain
trap)
Start-up
Measurements
Results of measurements of the unit operation parameters
Air supply
Exhaust
Air flow
Air flow
Designed
[m
3
/h]
Measured
[m
3
/h]
Difference
[%]
Designed
[m
3
/h]
Measured
[m
3
/h]
Difference
[%]
NOTE:
Returning a filled-in Equipment Acceptance Report within 30 days from the date of commissioning constitutes
the basis for granting the warranty. Please send the Reports to:
•
e-mail:
or to:
•
Address: Frapol Sp. z o.o., ul.
Mierzeja Wiślana 8, 30
-
832 Kraków; Add a note “Maintenance”