INSTALLATION INSTRUCTION MANUAL

TANK DRAWDOWN

8

8.  Connect the black wire from the cut-in pressure switch to the Normally Closed 
(NC) terminal on the Auxiliary Relay Board. Connect the Red wire from the 
regulating pressure switch to the Normally Open (NO) terminal on the Auxiliary 
Relay Board. 

9.  Connect the orange and blue wires to the shut-off terminals. 

Summary of Contents for SubDrive NEMA 4

Page 1: ...SubDrive Tank Drawdown Installation Instruction Manual 225770901...

Page 2: ...225767101 Rev 2 M1617 10 10 400 E Spring Street Bluffton IN 46714 Tel 260 824 2900 Fax 260 824 2909 www franklin electric com...

Page 3: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN...

Page 4: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN...

Page 5: ...ous internal voltage to discharge ATTENTION This equipment is intended for installation only by technically qualified personnel Failure to install it in compliance with national and local electrical c...

Page 6: ...ve power from the drive and wait at least 10 minutes before accessing the drive to ensure that the bus voltage has been given sufficient time to dissipate 2 Remove the customer access panel ACCESS PAN...

Page 7: ...harge pressure The pressure can be adjusted once the system is up and running 5 Use the supplied 6 conductor pressure sensor cable to attach the sensor cable to the sensor as shown See Figure 1 pg 5 f...

Page 8: ...or at J11 8 Connect the Jumper wire to the pressure sensor J11 terminal and to the Common COM terminal of the Auxiliary Relay Board 9 Connect the black wire from the cut in pressure switch to the Norm...

Page 9: ...Re apply power to the drive 13 Adjust the pressure setting of the low pressure cut in switch for the appropriate off time The pressure setting on the additional sensor will need to be set below the r...

Page 10: ...etting on the additional sensor will need to be set below the regulating sensor but above the tank pre charge pressure The pressure can be adjusted once the system is up and running 3 Remove the outsi...

Page 11: ...DRAWDOWN 7 6 Connect the green wire to the pressure sensor J12 terminal at the SubDrive Connect the white wire to the piggyback connector at J12 7 Connect the Jumper wire to the pressure sensor J11 te...

Page 12: ...om the cut in pressure switch to the Normally Closed NC terminal on the Auxiliary Relay Board Connect the Red wire from the regulating pressure switch to the Normally Open NO terminal on the Auxiliary...

Page 13: ...the access cover 11 Re apply power 12 Adjust the pressure setting on the low pressure cut in switch for the appropriate off time The pressure setting on the additional sensor will need to be set below...

Page 14: ...ATION INSTRUCTION MANUAL TANK DRAWDOWN 10 COM White Green Red Jumper Pressure Sensor Relay NC NO Low Cut in Sensor Regulating Sensor Overpressure Sensor Shut Off Blue Orange Black Figure 2 SubDrive300...

Page 15: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN Notes...

Page 16: ...INSTALLATION INSTRUCTION MANUAL TANK DRAWDOWN Notes...

Reviews: