6  Safety instructions

General information on using our products and systems:

Information about or assessments of the use and installation of our products and systems is exclusively provided on the basis of the information submitted. We do not assume any liability for 
damage caused by incomplete information. If the actual situation deviates from the planned situation or if a new situation occurs or if different or new installation techniques are applied, these 
must be agreed upon with FRÄNKISCHE, since these situations or techniques may lead to different conclusions. Notwithstanding the above, the customer is solely responsible for verifying the 
suitability of our products and systems for the intended purpose. In addition, we do not assume any liability or responsibility for system characteristics and system functionalities when third-party 
products or accessories are used in combination with FRÄNKISCHE systems. We only assume liability if original FRÄNKISCHE products are used. For use in other countries than Germany, coun-
try-specific standards and regulations must also be observed.

All information provided in this publication is generally up to date at the time of printing. Moreover, this publication was prepared with the greatest possible care. However, we cannot rule out print-
ing errors or translation mistakes. Furthermore, we reserve the right to change products, specifications and other information, or changes may be necessary due to legal, material or other technical 
requirements, which no longer could be considered for this publication. For this reason, we are unable to accept any liability if this is based solely on the information contained in this publication. 
Instrumental in connection with information about products or services is always the purchase order, the respective product purchased and the related documentation or the information provided 
by our specialist staff in the specific case.

ATTENTION

 

CAUTION

 

WARNING

 

DANGER

Staff responsible for installation, assembly, operation, maintenance and repair must have appropriate  
qualifications required for this kind of work. The builder is responsible for organising in detail authority, 
responsibility and supervision of staff.

The operational safety of the system components supplied is only guaranteed in case of proper  
installation and correct use. Technical threshold values must not be exceeded.

Observe the accident prevention regulations and relevant standards and directives for installation,  
fitting, operation, maintenance and repair!

Non-compliance with the operating manual may result in considerable property damage, injury or death.

The system is part of an entire network. During installation, maintenance, service and repair work on one 
component, always consider the entire system. Avoid work during rain.

Changes or modifications to the system may only be carried out with the agreement of the manufacturer.  
For safety reasons, use original spare parts and accessories approved by the manufacturer. The use of 
other parts voids the liability for any consequences arising therefrom.

This includes (in extracts):

n

  Accident prevention regulations

 

- Construction work BGV C22 (

Bauarbeiten BGV C22

)

 

- Technical wastewater systems GUV-V C5 (

Abwassertechnische Anlagen GUV-V C5

)

n

  Safety regulations for working in enclosed spaces of technical wastewater systems GUV-R 126  

(

Sicherheitsregeln für Arbeiten in umschlossenen Räumen von abwassertechnischen Anlagen GUV-R 126

)

n

  Handling biological working materials in technical wastewater systems GUV-R 145  

(

Umgang mit biologischen Arbeitsstoffen in abwassertechnischen Anlagen GUV-R 145

)

n

  Directives for working in tanks and narrow spaces BGR 117  

(

Richtlinien für Arbeiten in Behältern und engen Räumen BGR 117

)

n

 Standards

 

- Excavations and trenches – Slopes, planking and strutting, breadths of working spaces DIN 4124

 

- Construction and testing of drains and sewers DIN EN 1610

n

  Tool for safety and health protection in technical wastewater systems

n

  Hazards from gases and vapours such as risk of suffocation, risk of poisoning and risk of explosion

n

  Risk of falling

n

  Risk of drowning

n

  Germ pollution and wastewater with sewage

n

  High physical and psychological stress during work in deep, narrow and dark spaces

n

  And others

Summary of Contents for Quadro Lift

Page 1: ...Quadro Lift pump shaft The pump shaft in the Rigofill modular block type structure Installation manual Drainage Systems www fraenkische com...

Page 2: ...ct Contact persons K nigsberg headquarters International Sales Director European Sales Director European Sales International Sales Technology Julia M ller 49 9525 88 2394 julia moeller fraenkische de...

Page 3: ...ump sump 8 4 2 Placement of extension pipe with connection openings 10 4 3 Backfilling compacting up to the connection openings 13 4 4 Installing connecting the pressure line 13 4 5 Installing the con...

Page 4: ...esign QuadroLift is a versatile and modular pump shaft DO 600 You can integrate the sys tem pump shaft into the Rigofill system Maintenance does not require entering the shaft the pump unit can be eas...

Page 5: ...he installation of Rigofill storage infiltration modules www fraenkische de Rigofill inspect storage infiltration module QuadroControl flushing and inspection shaft Protective geotextile inside Protec...

Page 6: ...hey are protected from getting dirty Store the components on sleepers on plain ground Check the components for defects before installation The impact strength of the material decreases in sub zero tem...

Page 7: ...to it Use suitable lifting equipment to place the shaft in the intended position in the layout 2 Observe the correct orientation of the shaft openings The openings must always be orientated towards th...

Page 8: ...rane for the pump sump ATTENTION Install QuadroLift with its openings facing the direction of the tunnel QuadroLift with pump sump should be placed as the first component Carry out the remaining insta...

Page 9: ...been finished after the final layer has been installed Note Please observe the respective installation manual for the installation of Rigofill storage infiltration modules Install accessories Continue...

Page 10: ...er 4 2 2 Cutting the extension pipe without extension Top edge of terrain Temporary construction site cover To cut the extension pipe to length measure the height from the top temporary construction s...

Page 11: ...the extension pipe with extension to length measure the height from the top temporary construction site cover downwards NB You must always cut the pipe in the corrugation trough Height of extension p...

Page 12: ...cant to the sealing rings and the inside of the couple cone coupling do not use oils and greases 1 The extension pipes are inserted into the cone coupling coupling by means of sealing rings included i...

Page 13: ...ATTENTION We recommend having the system approved by site management before backfilling Do not remove included protective covers from shafts during backfilling n Backfill the excavation pit according...

Page 14: ...alling the fixture for the chain CAUTION Compacting by means of vibratory rollers and explosion rammers is not permissible ATTENTION Do not remove included protective covers from shafts during backfil...

Page 15: ...4034 under the shaft cover on an appropriate bearing The shaft cover can be placed on a 10 mm thick mortar joint to avoid stationary loads between equalisation ring and shaft cover Create the bearing...

Page 16: ...can connect the pressure line to the pump you must calculate the required length Use the following formula to calculate the length of the pressure line The calculated length must be measured from the...

Page 17: ...he chain to the lifting tool at the pump 1 Dismantle the screw terminal and the air valve at the end of the sensor cable 2 Push the cable gland and sensor bracket onto the cable 5 1 3 Connecting the p...

Page 18: ...Inserting the sensor into the base ATTENTION Make sure that the sensor does not protrude from the bottom of the fixture Now insert the sensor and the sensor bracket into the designated fixture at the...

Page 19: ...In addition make sure that the level sensor does not slip out of the fixture while lowering CAUTION Carefully lower the pump unit into the shaft The weight should be borne solely by the chain You must...

Page 20: ...installed connection Finally hook the chain into the upper section of the shaft 2 To fit the feed through watertight into the shaft opening hand tighten the four screws clockwise until the feed throu...

Page 21: ...allation manual QuadroLift 21 5 3 Installing the control cabinet NB Please observe the separate operating instructions for commissioning and handling the control unit These are enclosed with the deliv...

Page 22: ...Installation manual QuadroLift 22 Notes...

Page 23: ...eration maintenance and repair must have appropriate qualifications required for this kind of work The builder is responsible for organising in detail authority responsibility and supervision of staff...

Page 24: ...ge without notice Cat no 5000 1810 00 05 2022 DE 90139 1 FR NKISCHE Rohrwerke Gebr Kirchner GmbH Co KG Hellinger Str 1 97486 K nigsberg Germany Phone 49 9525 88 2200 Fax 49 9525 88 92200 marketing fra...

Reviews: