ZMI
_001_
2030
0191
75-F
A
ID0
008_
#SEN_
#
AQU_
#V1.
fm
- 6 -
10.5
Screw the manual actuator (g) into the fork head (f) of the deflection lever and lock
with a nut.
10.6
Using the spirit level, align the manual actuator (g) so that it is vertical.
10.7
Mark drill holes for the wall support (h) 40 mm above the triangular handle.
10.8
Drill in accordance with these markings.
10.9
Insert the wall plugs.
10.10
Screw on the wall support (c).
10.11
Screw the wall bracket (j) into the shower head (k) so that a seal is formed.
10.12
Seal in the shower head with the wall bracket and bring into position.
10.13
Check the water connection for leaks.
10.14
Plug the manual actuator if need be.
11. Function
11.1
Pull the manual actuator.
• The water will flow.
☞
The valve is not self-closing!
11.2
Place the manual actuator back in its start position.
• The water stops flowing.
12. Maintenance and care
Check the emergency shower once a month to make sure that it is in working order.
(Guidelines for Laboratories BGI/GUV-I 850-0)
As a measure for the prevention of microbiological contamination, it is recom-
mended that you replace the fill water in the fitting at shorter intervals by opening the
valve.
Use suitable cleaning agents which do not attack the tap in a proper manner and
rinse with water after use. High-pressure cleaners must not be used for cleaning.