Mast climbing work platform
High priority warning: Height of the first and second wall tie
Amendment to all the FRACO platforms User’s Guide
Please read carefully the present letter and insert it in all your Fraco User’s Guide:
Fraco is changing the anchoring procedure for all types of platforms when using ground base. The most
recent versions of our user’s guide are available on our Web site (
www.fraco.com
). Please refer to them
for installation procedures with regards to changes below.
The two first ties must be at 10 and 20 feet or at the two first accessible structural levels on the building
(max 20’).
This new procedure is to upgrade the safety of our platform during the operation of installation and
dismantling.
The platform
must be secured
by lifting equipment while installing or dismantling the two first ties. Once
the second tie is in place, the installation continues by the usual procedure; reduce load platform (1/2 load)
except the ACT-4 and the anchoring sequence typical for the type of platform in use as shown below:
FRSM-1500, FRSM-3000, FRSM-8000 : 20 feet
ACT-8 et FRSM-20 K : 30 feet
ACT-4 : 40 feet
For more information, contact our Technical Department:
Julie Rainville
Technical Service Director
Fraco Products
T: 800-267-0094 / 450-658-0094
F: 450-658-8905
Summary of Contents for FRSM-8000
Page 3: ......
Page 10: ...Part II Installing the platform...
Page 30: ...Part III Options Miscellanous...
Page 35: ......
Page 36: ...Part IV Mast and anchor installation...
Page 50: ...Part V Operating the platform...
Page 58: ......