Summary of Contents for KRAKEN 130 V2
Page 3: ...3 20 1 Frame Arm Assembly And Installation Step 1 Step 2 ...
Page 4: ...4 20 Step 3 Step 4 ...
Page 5: ...5 20 Step 5 Please repeat Step1 to Step 5 to assembly other Frame Arms Step 6 ...
Page 6: ...6 20 Step 7 Step 8 ...
Page 7: ...7 20 2 Landing Gear Assembly And Installation Step1 Step 2 ...
Page 8: ...8 20 Step 3 Step 4 ...
Page 10: ...10 20 Landing Gear Operation Voltage 4 8 6V Electronic Equipments Connection ...
Page 11: ...11 20 Step 1 Step 2 ...
Page 12: ...12 20 Step 3 Step 4 ...
Page 13: ...13 20 4 Propeller Installation Step 1 Step 2 ...
Page 14: ...14 20 Step 3 ...
Page 16: ...16 20 Kraken130 V2 Parts List ...
Page 18: ...18 20 MEMO ...
Page 19: ...19 20 ...