background image

STEP 2 / PASO 2
ATTACH SUPPORTING RING (B) TO EACH LEG TUBE USING BOLTS (D), 

BOLTS (E) AND FEMALE NUTS (F) AS SHOWN.
ADJUNTE EL ARO DE SOPORTE (B) A CADA TUBO USANDO PERNOS (D), 

PERNOS (E) Y LAS TUERCAS (F) COMO SE MUESTRA.

STEP 3 / PASO 3
TIGHTEN ALL BOLTS AND PUT THE PLASTIC COVER (G) TO THE TABLE TOP.
AJUSTE TODOS LOS PERNOS Y COLOQUE LAS CUBIERTAS DE PLASTICO 

(G) A LA SUPERFICIE DE LA MESA.

4

Do you have any questions ?  Missing small parts or hardware ? 

If you need assistance with the assembly of your 

6PC PATIO SET – TABLE please e-mail our Customer Service
Department at:

 

[email protected] 

or call us at (508) 473-7688

 

or (800) 639-3803

Please include the following information in your email:

• Where item was purchased 

• Item, model, style or SKU number listed on instructions or box

• Part number, description of the part and quantity needed

This information will help us get the proper part to you faster

¿Tiene alguna pregunta? ¿Faltan piezas o accesorios pequeños?

Si necesita ayuda para ensamblar su JUEGO DE PATIO 6PZ – MESA 

envíenos un correo electrónico a nuestro 
Departamento de atención al cliente: 

[email protected]

o llámenos al (508) 473-7688 

o al (800) 639-3803

Incluya la siguiente información en el correo electrónico:

• Dónde compró el producto

• El número de articulo, SKU, estilo, modelo o producto que

   aparece en las instrucciones o la caja

• El número y descripción de la pieza y la cantidad que necesita
Esta información nos ayudará a enviarle la pieza correcta con mayor rapidez

G

C

C

B

B

D

F

E

Reviews: