
February 2003
© 2003 Foundry Networks, Inc.
4-1
C
HAPTER
4
I
NSTALLING
THE
S
WITCH
Selecting a Site
Switch units can be mounted in a standard 19-inch equipment
rack or on a flat surface. Be sure to follow the guidelines below
when choosing a location.
•
The site should:
•
be at the center of all the devices you want to link and
near a power outlet.
•
be able to maintain its temperature within 0 to 50° C (32
to 122 °F) and its humidity within 10% to 90%,
non-condensing
•
provide adequate space (approximately two inches) on all
sides for proper air flow
•
be accessible for installing, cabling and maintaining the
devices
•
allow the status LEDs to be clearly visible
•
Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference, such as radios, transmitters, etc.
•
Make sure that a separate grounded power outlet that
provides 100 to 240 VAC, 50 to 60 Hz, is within 2.44 m (8 feet)
of each device and is powered from an independent circuit
breaker. As with any equipment, using a filter or surge
Summary of Contents for EdgeIron 2402CF
Page 12: ...RXQGU 1HWZRUNV QF HEUXDU...
Page 24: ...A BO U TT H ESW IT C H 2 10 2003 Foundry Networks Inc February 2003...
Page 44: ...T R O U BLE SH O O TIN G A 4 2003 Foundry Networks Inc February 2003...
Page 62: ...Glossary 6 2003 Foundry Networks Inc February 2003...
Page 66: ...QGH Index 4 2003 Foundry Networks Inc February 2003...