Installing the machine
—————————————————————————————————————–———
———————————————————————————–––––––––––––––––––––––––
Operating Manual Skiving Machine ES 50-UK-V3/24.01.2012
26 von 45
1.10.3
Installation of the machine
Figure 4: Installation plan of the machine
The floor space requirements for the operational machine can be calculated
from the above figure. The floor area of the machine should be clean and
flat. The adjustable basescrews will mount the machine to the floor.
1.10.4
Preliminary work for start-up
Cleaning the machine
The machine is provided by the supplier with a corrosion-protective coat
which must be removed prior to start-up. The following work must be
carried out:
Cleaning of all belt pulleys.
Cleaning of the guide element (presser roll/foot).
Cleaning of the bell knife.
Accessory equipment for the installation
The work lamp is fitted to the bushing socket and fastened with the cap
screw mounted on the lamp.