PURE VIEW: Fe
26
GLASS BALUSTER INSTALLATION
5
*Installed heights include a
3-3/4” [95.5mm] space between deck surface
and bottom edge of bottom rail.
Universal Bracket (UB)
Post Configuration
34” [864mm]
40” [1016mm]
38-1/16” [967mm]
43-7/8” [1114mm]
39-1/2” [1003mm]
45-1/2” [1156mm]
Fe
26
Pure View Baluster
Panel Height
Rail Panel
Installed Panel Height*
Required Post
Step 1:
Install Wood Blocks
1. Install Wood Block level with top of joist. As shown in Fig.1(A)
2. Secure Wood Block to blocking on all four sides with #10 X
3-1/2” [89mm] deck screws.
•
Wood Block must be constructed with treated dimensional
lumber with a minimum thickness of 1 1/2” [38mm].
POST MOUNTING
*If using Fortress Evolution Framing, contact Fortress for instructions.
Note:
It’s recommended to install brackets into post before post
mounting. Reference page 7 for bracket Installation steps.
Fig. 1
#10 x 3-1/3”
[84.5mm]
(A)
(A)
Joist
Blocking
Summary of Contents for PURE VIEW GLASS BALUSTER FOR Fe26 STEEL
Page 15: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 15 Fig 3 Fig 4 ...
Page 27: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 27 ...
Page 39: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 39 ...
Page 44: ...BALAUSTRE DE VIDRIO PURE VIEW PARA Fe26 STEEL INSTRUCCIONES DE INSTALACIÓN Pure View ...
Page 57: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 57 Fig 3 Fig 4 ...
Page 69: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 69 ...
Page 81: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 81 ...
Page 99: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 99 Fig 3 Fig 4 ...
Page 111: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 111 ...
Page 123: ...PURE VIEW Fe26 GLASS BALUSTER INSTALLATION 123 ...