FENCING INSTALLATION: EVOLVER
3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits. The fence installer should determine and
implement appropriate installation techniques for each
installation situation. Fortress Building Products and its
distributors shall not be held liable for improper or
unsafe installations.
Before You Begin
Contact your local Building Code Department for required
permits and laws regarding your fence project.
If applicable, also contact your Home Owners Association
for rules and regulations regarding fence installations in
your neighborhood.
Call 811 before you dig post holes to locate and identify
any buried utilities.
Components
Locking Clip
Side Rail Support
Fastener Post Slide Cover
Top Rail
Post
Bottom Rail
Intermediate Rail
45
o
Converter
70-7/8”
[1800mm]
Post Base
Post Cap
Fence Board
70-1/2”
[1791mm]