background image

www.fortresspower.com | (877) 497-6937 | [email protected]

2

11-01-21 REV1.0

Inverter Programing for eVault Max

Before operating the eVault Max be sure to read 

the Quick Start Guide, this Setup Guide. and the 

full Installation Manual. 

It is critical to program your inverter or charge 

controller’s settings for correct operation, im-

proper programming of your system equipment 

may invalidate your battery warranty and could 

degrade system performance. 

3

4

1

2

Basic Battery Settings

170A

Max Charge Current 

(per battery)

180A

Max Discharge Current 

(per battery)

360Ah

Battery Capacity 

(per battery)

54.4V

Absorption Voltage

54.4V

Equalization Voltage

(or Disabled)

Charging Settings

Float Voltage

54.4V

for open loop control

Li-ion

Battery Type 

(or Custom programmed per Step 2)

30

Equalization Days

(or Max Number)

0

Equalization Hours

(or Lowest Number)

49V

Shutdown Voltage

(or nearest voltage)

51.8V

Cut-in Battery Voltage

Discharge/Cutoff Settings

Cut-out Battery Voltage

51.4V

for open loop control

98%

Charging Efficiency

(if required)

5mΩ

Battery Resistance

(Applicable to Sol-Ark)

BASIC SETUP GUIDE

eVault Max 18.5

Advanced Settings

for closed loop control

Closed loop is only supported by select inverters and 

requires a custom communication cable. 

For detailed instructions on implementation and a full 

compatibility list please visit our website at:

 

http://fortresspower.com/inverter-guides

3

USB Logging

The eVault Max includes a USB stick for data logging 

information from the battery when requested by tech 

support. This should be left 

unplugged

 when not in use 

or it can cause performance issues with the battery. 

120Ω

OFF

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

COM_Parallel

INVERTER

CAN

RS485

IN

OUT

USB Logging

USB Port

Reviews: