INSTALLATION PREPARATION
* Please plug in and check that all functions are working
* Remove stainless steel baffle filter and grease tray.
TOOLS AND MATERIALS REQUIRED
(Not supplied)
Pencil and tape measure
Duct tape
Wire cutter/stripper
Wrench
Hammer
Keyhole Saw
Level
Safety glasses
Step ladder
Electric or battery-operated
drill and 1/8", 3/8" bits
Wire nuts
Pliers
Saber saw or Sawzall
Screwdrivers
10" round metal duct,
length to suit installation
Metal Snips
Flashlight
Strain relief for joint cover.
120V 60Hz. 15 or 20 Amp, 2-wire with ground.
Properly grounded branch circuit.
7