HELIO
™
BOLLARD
SURFACE MOUNT WITH J-BOLTS INSTALLATION & WIRING INSTRUCTIONS
page 1 of 4 | Rev. 05-25-21
© 2021 Forms+Surfaces® | All dimensions are nominal. Specifications and pricing subject to change without notice. For the most current version of this document, please refer to our website at www.forms-surfaces.com.
T 800.451.0410 | www.forms-surfaces.com
TOOLS NEEDED
MATERIALS INCLUDED
STEP BY STEP
Pour concrete footer
• Mix and pour concrete footer according
to concrete manufacturer’s instructions.
• A sufficient footer size depends on frost
and other conditions to be determined by
the installer.
• A minimum of a 13" diameter x 20"
deep footer is recommended.
Insert J-bolt anchors
• Insert 1/2"-13 x 18" galvanized steel
J-bolt anchors (a) into concrete.
• Use template to position J-bolt
anchors in proper locations. Tops of
J-bolt anchors must be a minimum of
1-1/4" above concrete surface.
• Allow concrete to set completely, in
accordance with concrete
manufacturer’s instructions, before
moving to step 3.
FOR ALL SURFACE MOUNT HELIO BOLLARDS
a
socket wrench
3/4
"
socket
c
b
a
template
(upon request)
a
e
d
DIAMETER
a
DEPTH
1-1/4"
MINIMUM
Prepare the incoming power
• Before pouring concrete footer, run
properly sized conduit and cabling to
each luminary location according to local
code requirements. Refer to figure
above for dimensions for conduit entry
envelope size and location on luminary.
Forms+Surfaces is not responsible for
site preparation and footings
.
Note: Conduit should not protrude more
than 2" above mounting surface.
Ø2.5" Conduit
Entry Location
3X Slots for
Anchor Bolts