Preparation and setup |
21
4
Preparation and setup
4.1
Location and environs
Prepare a space to install and operate the Fuse Sift and house the necessary accessories
and consumables.
To prepare the workspace for the Fuse Sift:
1. Choose a location separate from any machinery or tooling that generates dust or sparks,
such as wood or metal working equipment.
2. The Fuse Sift, build chamber, vacuum, and powder cartridge are free standing components.
Reserve the following minimum dimensions for the most convenient access:
•
Fuse Sift
: 221.1 × 122.0 × 218.0 cm (87.1 × 48.0 × 85.8 in)
°
The Fuse Sift footprint is 99.1 × 61.0 × 157.0 cm
(39.0 × 24.0 × 61.8 in). With the hood open, the
Fuse Sift is 188.8 cm (74.3 in) in height. Leave at
least 61 cm (24 in) to the left, front, and right of the
unit free for access.
°
Place the Fuse Sift at least 20.0 cm (8.0 in) from
nearby walls.
°
Do not overlap with the Fuse 1 access footprint by
more than 30.5 cm (12.0 in).
3. Ensure proper ventilation is installed.
Sintering nylon powder produces laurolactam, a white powder that accumulates
within the print enclosure, filter mediums, and exhaust. Proper ventilation is required
whenever the Fuse 1 or Fuse Sift is operating.
4. Purchase additional supplies:
•
Compliant vacuum that is grounded and bonded (e.g., Class II, Division 2 vacuum)
•
Particulate filtering respiratory protection (N95 or better)
•
Non-reactive nitrile gloves
•
Safety glasses
4.2
Power and networking
For detailed guidance and visual assistance, visit
support.formlabs.com
.
The Fuse Sift requires a dedicated AC circuit, providing at least 7.5 A at 230 VAC (EU)
or 15 A at 120 VAC (US) , as well as reliable grounding. This circuit must be separate
from other devices—including the corresponding Fuse 1, fans, vacuums, power tools,
space heaters, or any large appliances. Power surges may disrupt mixing or filling
operations and/or permanently damage sensitive components, jeopardizing the
reliability of the product.
CAUTION
NOTICE