P| 4
DEL RIO CATHEDRAL CEILING THICK TIMBER PAVILION
www.ForeverRedwood.com
NOTE:
In order to know where the post needs to be placed, check the numbers on them. If the post is not marked, then place the
single Supports on the ground to locate the markings for each post position and clearly set your bearings. (“Don´t attach yet, only
place them on the ground to begin with”).
Step 1:
Install the anchor base
(10)
with ½´´ X 4´´ anchor bolts
(A)
or lag bolts. Please see the “How to anchor your pergola
document” for all details. Set your post
(1)
in the saddle of the anchor bases
(10)
. Drill a ø ¼´´ hole in the post prior to anchoring
to facilitate the ratcheting of the hardware. After that, use a 5/16´´ X 3´´ lag bolts
(B)
to attach each post to the its respective
anchor base
(10).
5/16´´ X 3´´ Lag Bolts
1
1
1
1
1
1
10