
P| 10
MODERN LOUVERED GARDEN PERGOLA
www.ForeverRedwood.com
Step 7:
Use 3/8” x 2 ½” Lag Bolts
(LB4)
to attach the Panels
(9)
to the Supports and to the central supports. check the marked
numbers on each panel and place as drawings shown (D-1 at D-12).
Step 8:
Attach the curtain bases-A&B
(12, 13)
to the supports and to the post with 1 5/8” deck screws
(DS2)
.
LB4
D-8
D-1
DS2
DS2
12
13