From underneath the shelf screw through the framing into the framing 

of the front, back and side panels using 2x40mm screws for each.

 (6 x 40mm screws for each shelf)

Fix two hinges to the underside of each (folding shelf) using 3x25mm screws for 

each hinge. Fix a bolt to each end of the opposite batten using the screws provided.

Place the shelf into the green house and fix the other half of the hinge to the 

underside of the back 1400mm batten using another 3x25mm screws for each.

Open the shelf and mark the position of the bolt’s receiver on the fixed shelfs before 

securing in place.

Fix two hinges to the side of each TWGDR as shown using 3x25mm 

screws for each hinge. Place these against the panels you previously 

fixed in step 4 so that the hinge is against the inside of the frame and 

secure the other half of each hinge using 3x25mm screws.

Fix a handle to each of the doors making sure that these are in line with each other. Fix each in 

place using 25mm screws.

Place the latch so that it is in line with central batten of each door and will hold the door securely 

when fixed. Fix using the 5.0 x 25mm screws provided.

Close the left hand door which you have just fixed. Place the LOCKBLOCK on the inside of the door so that 

it is in line with the framework and sits at least 3mm above the bottom batten. Fix the block in place using 

2x30mm screws.

Fix a bolt to the block you have just placed using the 25mm screws provided.

Fix the remaining bolt to the top of the door making sure that the bolt will locate in to the notch on the top 

batten.

Forest Garden Ltd, Unit 288 Hartlebury 

T

rading Estate, Hartlebury

, W

orcestershire DY10 4JB

issue 0217

 

D

D

 

PRE-DRILL

PRE-DRILL

PRE-DRILL

PRE-DRILL

PRE-DRILL

PRE-DRILL

Reviews: