Fix the top outer ring of fascias so that they sit on the lip of the
posts and all meet up at the ends.
Fix the boards using 2x50mm screws at each end.
Position and mark out the ground so that the posts will be
2220mm apart from the notches as shown.
1
2
1
Attention:
Before you begin construction we recommend that you place
all the parts in the order that you will use them. Read
carefully through the steps of the instructions first.
2220
We recommend the use of spikes to anchor these into the ground.
b
level