background image

SAGAPEX

Qty 2

Profile

SAGDP

SAGPP

SAGWINP

Qty 2

RPDCILL

PHSTABLEDR

Qty 2

SAGRF

Qty 2

RPDBARGE

Qty 4

PDDRHANDLE

Qty 2

PDROOFSTRIP

Qty 2

20x12x1043mm

SAGHINGE

SAGFELT

FELT

f

g

h

i

l

m

b

c

p

q

u

k

a

STRINGRH

d

j

n

o

s

t

r

54260600PPT

Batten 600mm

POST952

(952mm LONG)

Qty 2

SAGRAIL6

BRACE390

Qty 8

SAGRAIL11

POST1630

(1630mm LONG)

Qty 2

BASEMSFP

Qty 4

v

PARTS LIST

w

STRINGLH

PDSTEP

Qty 3

x

DB9519

PT

1712

DECK BOARD 1712mm

Qty 2

DB9519

PT

1780

DECK BOARD 1780mm

Qty 11

5426

PPT

1712

BATTEN 1712mm

Qty 2

5426

PPT

1188

BATTEN 1188mm

Qty 4

5426

PPT

1104

BATTEN 1104mm

Qty 1

y

z

SAGCSTRIP

Qty 4

a1

b1

c1

PHWIN468

Qty 3

e

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

Summary of Contents for SAGE RAISED PLAYHOUSE

Page 1: ...tdoor use only This product is intended for use by children of up to age 10 years Only for domestic use Technical Help line 7777 089 8 30 am and 5 00 pm Monday to 0333 Friday In line with your statuto...

Page 2: ...52 952mm LONG Qty 2 SAGRAIL6 BRACE390 Qty 8 SAGRAIL11 POST1630 1630mm LONG Qty 2 BASEMSFP Qty 4 v PARTS LIST w STRINGLH PDSTEP Qty 3 x DB9519 PT 1712 DECK BOARD 1712mm Qty 2 DB9519 PT 1780 DECK BOARD...

Page 3: ...re not protruding q K x 2 Ensure screws locate in to the framing and are not protruding C s r a1 c1 b1 y z Flush Place all of the boards before fixing Make sure that all the gaps are even and that the...

Page 4: ...n as a measuring stick for positioning your panels correctly Framework Flush Do not secure the panels to the floor at this point q D q D q D q D q D q D q D q D q D 4 6 a Window Assembly Flush a c e k...

Page 5: ...25mm 395mm floor level 6mm 395mm J G x 3 9 15mm 13mm 13mm 13mm Attention Gaps must be at least 13mm G x 2 10 h Flush with the inside of the door framing Forest Garden Ltd Unit 288 Hartlebury Trading...

Page 6: ...anels to the base L L g In line with the apex Overhang at the front 14 13 E Ensure screws locate in to the framing and are not protruding Ensure screws heads are flush with the bracket Flush with the...

Page 7: ...18 17 v W X D m D Ensure screws locate in to the ends of the rafters C C C C C Ensure screws locate in to the framing and are not protruding B x 2 q Attention Take care when cutting or trimming roof f...

Page 8: ...Ground Level f G x 4 B x 2 x 4 B Underneath 19 20 Spikes must be flush to the post and and buried in the ground at least 150mm...

Reviews: