PRE-DRILL
PRE-DRILL
PRE-DRILL
a
e
1
2
Place the panels on top of the base
making sure that they are all tight
and flush before fixing the panels
together using 2x 50mm screws for
each corner.
Fix the front and back panels to
the floor using 2 x 50mm screws
for each screwing down through
the framing from inside.
f
f
f
f
f
f
f
f
11
10
9
Place the angled boards against the
front and back panels as shown to
create an apex. Fix each board in
place using 2 x 25mm screws.
Fix each of the corner strips along the
edges so that they are flush and fix
each in place using 3 x nails.
f
f
f
Floor Assembly
Board and batten
should be flush.
e
4
e
e
e
d
d
85mm
The top point of the
board should be offset
85mm from the panel