background image

12

29

18

17

G

L

X2

Place the strips to

the le& and right

hand side of the

entrance so they are

flush with the

window side and

overhang the

entrance

Fix each strip with

30mm nails.

Place the shaped

ba# en centrally

above the entrance

and fix in place using

3 x 50mm screws

making sure you are

screwing into the

framework behind.

Place the 1650mm strip inside the

entrance and against the framing. This

should also be flush with the framing on

the inside. Fix each strip with 3 x 30mm

screws

Fix the 1142mm strip at the

bo# om of the door entrance and

flush with the framing using 4 x

30mm nails.

Place the barge boards against the outside of the summer house making sure

that they meet at the apex and fix using 3 x 40mm screws.

Place the finial against the front and fix using 2 x 30mm nails.

Unroll the felt into three equal lengths and posi$on them on the building as

shown and that there is at least a 50mm overhang on all sides. Fix the felt in

place using the felt tacks provided and in 150mm intervals.  Make sure the

tacks locate into the ba# ens behind.

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

M

N

M

N

K

13

30

13

13

31

H

X3

L

X4

L

X2

M

N

K

K

K

L

X3

Cut and fold the
corners securing
with a single tack.

9

7

8

10

Reviews: