12
29
18
17
G
L
X2
Place the strips to
the le& and right
hand side of the
entrance so they are
flush with the
window side and
overhang the
entrance
Fix each strip with
30mm nails.
Place the shaped
ba# en centrally
above the entrance
and fix in place using
3 x 50mm screws
making sure you are
screwing into the
framework behind.
Place the 1650mm strip inside the
entrance and against the framing. This
should also be flush with the framing on
the inside. Fix each strip with 3 x 30mm
screws
Fix the 1142mm strip at the
bo# om of the door entrance and
flush with the framing using 4 x
30mm nails.
Place the barge boards against the outside of the summer house making sure
that they meet at the apex and fix using 3 x 40mm screws.
Place the finial against the front and fix using 2 x 30mm nails.
Unroll the felt into three equal lengths and posi$on them on the building as
shown and that there is at least a 50mm overhang on all sides. Fix the felt in
place using the felt tacks provided and in 150mm intervals. Make sure the
tacks locate into the ba# ens behind.
Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
M
N
M
N
K
13
30
13
13
31
H
X3
L
X4
L
X2
M
N
K
K
K
L
X3
Cut and fold the
corners securing
with a single tack.
9
7
8
10