Forest garden MTGSH64 Manual Download Page 2

10

Forest Garden Ltd, Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB 

Biocidal Product Regulation (EU 528/2012) Article 58 Information

This article contains timber treated with Celcure AC-500, incorporating biocidal products to give p

rotection against wood destroying insects & wood rotting fungi

Contains:

 Basic copper carbonate (Copper (II) carbonate – Copper (II) hydroxide (1:1)), Boric acid, Benzalkonium chloride.

Wear gloves when handling freshly treated wood. Avoid breathing dust when cutting treated or untreated wood. Dispose of off-cuts responsibly – do not burn.

6

7

Place and fix the Casement Stay centrally against the inside of the opening 
window and make sure it is offset at least 12mm from the to top of the frame so 
as not to hit the glass. Fix in place using 2 x 25mm screws.

Mark the position of the holes of the casement stay when the window is closed 
before fixing the pins in place using the 25mm screws provided.

Place the Drip Strip against the door end above door, fixing it in place using 
2 x 50mm screws.

Place each of the roof sections on to the top of the shed so that each section is flush 
with the door and plain ends. They should also be in line with the apex.

Fix each roof section in place using 3 x 30mm screws at each end and a 40mm screw 
mid way down the side screwing through the board into the top of the side panel.

5

8

Unroll  the felt and cut it in to two equal lengths. Place the sheets on each side so 
that there is a 50mm overhang on the eaves and they overlap at the apex. Fix these 
to the roof using felt nails spaced in 150mm intervals. Cut and fold the corners 
securing with a single felt nail for each.

Place the Barge Boards against the front and back of the shed. Make sure 
that these are in line with the roof sheet and meet at the apex. Fix each in 
place using 2 x 30mm screws.

Place the Finial over the top of the join between the two barge boards and 
fix this in place using 2 x 30mm screws.

9

M

F

H

K

L

Place the acrylic sheet inside the window frame and position the beading so that each 
section fits flush and keeps the sheet tight. Fix each piece using 3 x Panel Pins.

Fix two Flush hinges to the top of the window so that it sits in the rebate. Fix the 
smaller section of the hinge to the window using 2 x 25mm screws for each. Open up 
the hinges and fix the remaining section of each hinge to the top of the Window Panel 
using another 3 x 25mm screws for each hinge.

J

N

M

O

12mm Offset

Maintenance.

Regularly check that all fixings are secure.

Regularly check the quality of the roofing felt and that it is free of holes and splits.

Reviews: