Forest garden CRNRSUM77 Assembly Instructions Download Page 3

ISSUE 0414

 

5

W

W

F

Fix both of the 800mm strips (W) to the inside of door (F) so they are flush with the top and 
bottom of the door and overhang the side by 20mm. Fix each strip in place using 2 x (3.5 x 
30mm) screws.

Fix a shoot bolt to the top and bottom of the door. Fix the receiver to the framework between 
the two strips as illustrated. Use the 20mm black screws provided.

Still from inside the building line the lock up with the key hole in the door and fix using the 4 x 
32mm black screws.

6

8

Forest Garden Ltd. Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB

380mm

G

L

O

J

Place the roof sheet (J) on to a 2070mm batten (O) so that it sits on to the wider face and is 
flush with the sides. Fix using 6 x (3.5 x 30mm) screws spaced evenly. 

fix one of the 150mm blocks (L) so this is flush with the roof sheet but is 380mm apart from 
the batten. Fix using 2 x (3.5 x 30mm screws).

Repeat this for the other roof to make a left and right hand roof section.

 

From outside of your 
building fix a turn 
button to the top and 
bottom of the left hand 
door using 2 x (4.0 x 
30mm zinc) screws. 
Make sure that the 
turn button will reach 
across both doors 
when in its closed 
position.

Place a 1732mm angled post 
(M) against the end of the 
handrail so that the pitch of the 
angle is towards the apex. Fix 
this in place using a corner 
bracket. Use 2 x 50mm screws 
to secure each bracket to the 
floor and 2 x (3.5 x 30mm 
screws) to secure this to the 
post.

Further secure the post to rails 
using 2 x 50mm screws.

E

7

S

 I

Place the window (I) into the door end so that there is an equal gap each side before placing 
an 848mm (S) (

rebated

) batten on either side. The rebate should sit against the window.

Fix each batten in place using 3 x 50mm screws screwing into the door ends framework.

H

M

Summary of Contents for CRNRSUM77

Page 1: ...d preservative treatment Apply in accordance with the manufacturers instructions Timber is a natural material It will shrink and swell as a result of varying moisture content Please keep all plastic bags and small parts away from children This product must be built on a solid level base Technical Help line 0333 7777 089 8 30 am and 5 00 pm Monday to Friday In line with your statutory rights please...

Page 2: ...ews for each join Make sure that all four sides are square and fix them to the floor using 50mm screws Use 4x50mm screws for the door end A and Plain end B Use 3x50mm screws for the sides C Place each of the 1710mm strips Q against the corners of the building Fix each in place using 4 x 3 5 x 30mm screws Position the veranda E against the front of the building the cladded only From inside the buil...

Page 3: ...s L so this is flush with the roof sheet but is 380mm apart from the batten Fix using 2 x 3 5 x 30mm screws Repeat this for the other roof to make a left and right hand roof section From outside of your building fix a turn button to the top and bottom of the left hand door using 2 x 4 0 x 30mm zinc screws Make sure that the turn button will reach across both doors when in its closed position Place...

Page 4: ... roof is flush at the back Use 4 x 40mm screws to secure the roof to the side panels and 6 x 3 5 x 30mm screws to secure the roof section to the front and back panels Fix the roof section to the top of the 1508mm batten N with a single 50mm screw Place two pieces of the felt on the lower sections of the roof Make sure these are positioned centrally and have an overhang of approximately 50mm Secure...

Reviews: