![Forespar Leisure Furl OFFSHORE IN-BOOM FURLING SYSTEM Installation Manual Download Page 5](http://html.mh-extra.com/html/forespar/leisure-furl-offshore-in-boom-furling-system/leisure-furl-offshore-in-boom-furling-system_installation-manual_2319183005.webp)
5
03.12.09
TOOLING REQUIRED
Pencil
Paper
Hacksaw, including spare blade
Scraper
Soft hammer
Allen key set
Hole saw, See Diagram 1 for size
Electric drill ½” chuck
Electric grinder 4”
Masking tape
Tapping drill sizes – 9/64”, 3/16”, 1/4” 5/16”
Drills sizes - 3/16”, 1/4”, 5/16”, 3/8”
Intermediate taps – 3/16”, 1/4”, 5/16”, 3/8”
Tap wrench
Anti corrosion compound, Lanocote
TM
or similar compound
LocTite
Center punch
Mixing stick
Sand paper 180 or 220 grit
Cutting knife, long blade
Winch handle
Tape measure
Round file
Pop rivet gun to suit 3/16 rivets
Boson’s chair