![Ford M-6007-F50 Installation Instructions Download Page 3](http://html1.mh-extra.com/html/ford/m-6007-f50/m-6007-f50_installation-instructions_2318644003.webp)
M-6007-F50
Long Block Engine Assembly
INSTALLATION INSTRUCTIONS
NO PART OF THIS DOCUMENT MAY BE REPRODUCED WITHOUT PRIOR AGREEMENT AND WRITTEN PERMISSION OF
FORD RACING PERFORMANCE PARTS.
Techline 1-800-367-3788
Page 3 of 3
IS-1850-0285
Factory Ford shop manuals are available from Helm Publications, 1-800-782-4356
! ! ! IMPORTANT INFORMATION ! ! !
READ THIS PAGE BEFORE YOU START THE LONG BLOCK INSTALLATION PROCEDURES.
DO NOT USE PILOT SHAFT BEARING WITH AN AUTOMATIC TRANSMISSION.
THE PILOT SHAFT BEARING IS FOR MANUAL TRANSMISSION APPLICATIONS ONLY.
THE PILOT SHAFT BEARING MUST BE INSTALLED WITH THE SEAL FACING THE REAR OF THE VEHICLE.
STEP 1:
Sparingly lubricate the transmission front bearing retainer with long life lubricant (pn CIAZ-19590-BA).
STEP 2
:
Install the Pilot shaft Bearing (pn D4DZ-7600-A) with the seal facing the rear of vehicle. (See Detail “A”).
STEP 3:
Install the clutch, pressure plate and bellhousing as recommended in shop manual.
NO PARTS WARRANTY:
Competition parts are sold "as is" without any warranty whatsoever. Implied warranties, including warranties of merchantability or fitness for a particular
purpose, are excluded. The entire risk as to the quality and performance of such parts is with the buyer. Should such parts prove defective following their
purchase, the buyer and not the manufacturer, distributor or retailer, assumes the entire cost of all necessary servicing or repair.
Ford Motor Company vehicle and parts warranties are voided if the vehicle or part is used for competition or
if they fail as a result of modification.