
5
2. Attach the handrail joint to the top of the frame stand
tubing,insert bolt(a) into (b) as
illustrated. The spring pin will click into place once secure. Repeat
for the right side of frame.
Insert mattress into the crib.
3. To close the crib side panel; lift up the side of the crib and
attach the tubing to the tubing of
the crib body. Attach the studs on the tubing to secure.