background image

FontanaShowers

©

FontanaShowers

©

FontanaShowers

FontanaShowers

Customer Service: 800-684-4489

fontanashowers.com

2

Shower Head Installations Instruction 

Parts:

Step 3:

Step 1:

D

C

E

F

F

   

 

 

 

 Mark the 4 drilling positions   

then 

use the Ø6mm drill to drill holes on the 

wall  according  to  the  marked  hole 

position.

Inset the  plug(D)  into the hole, hold the 

fix

 base (C) use the tapping screw (D)  through 

fix

 base(C) holes, tighten the tapping screw  (D)  tighten the top shower 

fixed

 bar(E) and 

the inlet hose (F) with the fix base (C)

Reviews: