HARMONY • TOP-MOUNT
self-contained
13
Connect utilities to louvered docking assembly.
6
External connections
➊
➌
➋
➍
➋
➊
• Remove access panel if necessary
• Install drain line
➊
.
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Install ice machine potable water
supply
➋
• Replace access panel
Air-cooled ice machines only
• Remove access panel if necessary
• Install drain line
➊
.
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch.
• Connect cooling water supply
➋
and
return
➌
• Install ice machine potable water
supply
➍
• Replace access panel
Water-cooled ice machines only
6.1
6.2