background image

12

remote condensing 

DROP-IN  •  RIDE Technology

  •  Position plate into opening and secure 

with supplied screw

Power cord

7.5

CLEANER FULL

DRAIN CLOG

HIGH PRES

HIGH AMPS

SERVICE

MAINT/CLEAN

LOW WATER

TIME DELAY

SLEEP CYCLE

MAKING ICE

LOW BIN

POWER ON

CLEAN

TDS

HIGH

LOW

  •  Set the TDS switch on the electrical box:
  

HIGH: for extended service life

  

LOW: for low-scale water

TDS switch

7.6

Summary of Contents for Horizon Elite HCD1010NJS

Page 1: ...Installation Instructions for Drop Ins HCD HMD HCF HMF1010RJS HCD HMD HCF HMF1410RJS HCD HMD1010NJS HCD HMD1410NJS See model number configurator on page 2 for details 01113299R00 801 Church Lane East...

Page 2: ...umber Configurations CAUTION This appliance should be connected by a qualified person in accordance with applicable codes If the supply cord is damaged it must be replaced by the manufacturer its serv...

Page 3: ...mote condensing Front cover 8 Internal connection 7 Ice transport tube 5 External connection 6 Louvered docking assembly 4 Dispenser preparation 3 Site preparation 2 Unpack 1 Read and complete the fol...

Page 4: ...4 remote condensing DROP IN RIDE Technology Carefully unpack and inspect the contents of your Follett ice machine 1 Unpack 7 16 7 16 Unpack ice machine 1 1...

Page 5: ...Electrical 120 60 1 5 amps Potable water supply 3 8 push in internal connection 3 8 OD tubing required 10 70 psi 69 483kpa 45 90 F 7 32 C Follett recommends the use of an in line water filtration sys...

Page 6: ...h bulkhead fitting with flat up and tighten bulkhead nut Position and secure nut locking plate with supplied screws Verify installation of O ring on stainless steel ice transport tube coupling Insert...

Page 7: ...cking assembly 4 3 8 high pressure line 1010 1410 5 8 low pressure line 1 25 4 mm Stub Typ 1 88 47 8 mm 3 38 86 mm 2 50 8 mm Mount louvered docking assembly Rough in the refrigerant piping 2 1 Louvere...

Page 8: ...e of access panel door min of 3 25 83 mm from the front edge of the cross brace The mounting surface for the louvered docking assembly must be solid Do not mount directly onto runners or channels Ther...

Page 9: ...long tube runs see guide on page 14 Pitch ice transport tube at least 1 4 per foot 6 4mm 3m Ice transport tube must drain towards ice machine Ice transport tube to Ice machine Be sure tube ends are sq...

Page 10: ...in line The rigid drain line from the ice machine must have at least 1 4 per foot pitch 6 4mm 0 3m Rough in ice machine potable water supply 3 8 push in connection will be made at shut off valve insid...

Page 11: ...lide ice machine into louvered docking assembly ensuring that drain tube is fully seated on barbed drain fitting Insert ice transport tube all the way into coupling and tighten nut firmly Ice transpor...

Page 12: ...h supplied screw Power cord 7 5 CLEANER FULL DRAIN CLOG HIGH PRES HIGH AMPS SERVICE MAINT CLEAN LOW WATER TIME DELAY SLEEP CYCLE MAKING ICE LOW BIN POWER ON CLEAN TDS HIGH LOW Set the TDS switch on th...

Page 13: ...940 kcal hr 1410N 10 000 Btu hr 2519 kcal hr Install condensing unit 8 1 Slide ice machine cover over machine ensuring that tabs on back of cover slip under louvers on back of louvered docking assembl...

Page 14: ...IN RIDE Technology 1 4 1 max 2 ft 6m Pitch ice transport tube to allow melt water to drain towards ice machine Secure insulated ice transport tube at least every 2 ft 6m to prevent dips or traps Long...

Page 15: ...15 DROP IN RIDE Technology remote condensing...

Page 16: ...oll free 877 612 5086 1 610 252 7301 www follettice com Horizon Horizon Elite Maestro Harmony Ice Manager SafeCLEAN Sani Sponge and Vision are trademarks of Follett Corporation Chewblet RIDE and Folle...

Reviews: