11
DROP-IN • RIDE Technology
remote condensing
Connect docking assembly to ice machine.
7
Internal connections
➊
Refrigeration lines
7.3
➊
➋
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
➊
• Insert ice transport tube all the way into
coupling and tighten nut firmly
➋
Ice transport tube installation
7.1
➋
➊
• Insert potable water line into valve
➊
Water line
7.2
• Remove twist tie
• Carefully pass cord through opening and
plug into wall outlet
Power cord
7.4
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
➊