7
VISION • RIDE Technology
self-contained
Install the docking assembly.
Docking assembly
4
Prior to installing the docking assembly, ensure that the drain fitting is
oriented (right or left) correctly for your installation. An optional straight
drain fitting is also supplied. You may need to remove the back panel
of the docking assembly in order to re-orient or change the drain fitting.
Replace back panel prior to mounting the docking assembly.
BEFORE PROCEEDING
Machine stand accessory
Wall bracket accessory
• Mount docking assembly to wall bracket
accessory
DOCKING STATION
(See detail drawing on page 9)
• Position and screw docking assembly to the bottom of counter inside of access panel/door
➊
1010/1410: 2.25" (57 mm) from the front edge of asembly
710: 3.25" (82.55 mm) from the front edge of the cross brace
•
The mounting surface for the docking assembly must be solid.
Do not mount directly onto runners or channels.
• There must be no lip or edge that would hinder the ice machine from sliding in or out of the docking station
➋
INTAKE AND EXHAUST GRILLE PLACEMENT: Air-cooled models only
•
Position the intake grille cutout in the access panel/door
Note:
Ice machine must be aligned with cutout and inside of access panel to provide a tight seal and
prevent recirculation of hot exhaust air.
• Left edge of cutout from the left side of the ice machine
➌
1010/1410: 2.25" (57 mm)
710: 2" (51 mm)
• Bottom edge of cutout should be 2" (51 mm) from the bottom of the ice machine
➍
• Position supplied exhaust grille at least 18" (458mm) away from intake grille
➎
.
Where possible, install exhaust grille to the rear or side of the base cabinet.
• If not using supplied grille, air circulation requirements below must be met:
1010/1410: 250 sq. in (1613 sq cm) intake/exhaust air
710: 160 sq. in (1032 sq cm) intake/exhaust air
Undercounter installation requirements
4.1
• Mount docking assembly to machine
stand accessory