Focus Heterofocus 1400 Design Installation & Operating Manual Download Page 23

 

 

 

 

Page 23 of 24

 

 

 

Summary of Contents for Heterofocus 1400

Page 1: ...Operating Manual v 8 1 EN Tested by OMNI Test Laboratories Inc and approved to ULC S610 M87 A1998 UL 737 2011 And ULC S627 00 Report Number 304 F 20 2 US EPA exempt this document was packed with the...

Page 2: ...ed parts materials and required tools for installation b Options c Assembly details 4 OPERATING INSTRUCTIONS a Storage use of flammable liquids b Insulating hearth c Ashes d Fuel e Before lighting you...

Page 3: ...nufacturer focus atelier dominique imbert le fort 34380 viols le fort France 2 SPECIFICATIONS CAUTION DO NOT INSTALL IN A MOBILE HOME NOT FOR EXTERIOR INSTALLATION CAUTION NOT TO INSTALL WITH MASONRY...

Page 4: ...h long weight 90 kg 200 lbs Smoke outlet diameter 205 mm ID 8 1 16 inch length custom made Flue weight 27 kg per meter 18 lbs per foot Ceiling mount weight 15 kg 33 lbs 3 mm 1 8 inch thick steel Polis...

Page 5: ...lbow is necessary Elbows should not be more inclined than 30 USA or 45 Canada from vertical and with maximum number of 2 Maximum inside outside height without use of a fan 30 feet The heterofocus 1400...

Page 6: ...attic roof frame floor or ceiling must be done using an insulated chimney respecting all chimney manufacturer clearances For Canada the installation should conform to CAN CSA B365 CAUTION PASSAGE THR...

Page 7: ...n of the building envelope Installation of the combustion air inlet system will require a 6 diameter penetration through the wall and then insert the passive air vent with pipe extension through this...

Page 8: ...MINIMUM FLOOR TO CEILING HEIGHT 8 feet Clearance from front of the fireplace to any combustible material CAUTION THE DISTANCE TO A COMBUSTIBLE MATERIAL MUST BE MAINTAINED AT 36 FROM THE FIREPLACE FRO...

Page 9: ...PROPERTY DAMAGE OR DEATH CAN OCCUR IF THIS DISTANCE IS NOT MAINTAINED DRYWALL PRODUCTS LINED WITH PAPER SUCH AS SHEETROCK ARE COMBUSTIBLE CLEARANCES AS INDICATED FURTHER APPLY Clearances to non combus...

Page 10: ...THE UNIT AND CONNECTOR IS NECESSARY CLEARANCES MAY ONLY BE REDUCED BY MEANS APPROVED BY THE REGULATORY AUTHORITY Important manufacturer specifications To avoid premature aging of your painted walls o...

Page 11: ...n sides top cover polished raw steel flue pipe separable handle and focus kit heat protective glove mounting gloves Zebraline renewing wax tube manual Required tools drill M8 allen key level screwdriv...

Page 12: ...Page 12 of 24...

Page 13: ...Page 13 of 24...

Page 14: ...Page 14 of 24...

Page 15: ...Page 15 of 24 Hearth extentions must be installed only as illustrated Spark guard...

Page 16: ...lace An insulating fiber material is applied underneath the removable curved steel fire hearth made of several parts They must not be removed except for cleaning once all cinders have thoroughly coole...

Page 17: ...ish is raw waxed steel A tube of Zebraline graphite wax is provided to solely look after your fireplace It is highly recommended to wax your fireplace upon completion of installation and then twice a...

Page 18: ...er wood between 3 and 7 pieces depending on their size directly on top making sure not to smother the fire Leave some spaces between the logs for air intake Adapt the air intake position into the room...

Page 19: ...t be adapted to the fire intensity during the lighting it must be fully open Then it must be adjusted in order to reduce the smoke flow so the heat efficiency will be optimal If the fireplace spills o...

Page 20: ...risk of a chimney fire In that case call a professional chimney sweeper or buy a brush at your local focus retailer and clean the chimney this way Remove rain cap use appropriately sized brush and sw...

Page 21: ...ax to look after your fireplace when needed twice a year or more d Replacement parts WARNING DO NOT USE SUBSTITUTE MATERIALS For ordering replacement parts please contact the focus North American excl...

Page 22: ...uarantees are applicable only when our fireplaces have been installed with respect to all local building codes and with strict attention to the technical details outlined in our Plan Study as well as...

Page 23: ...Page 23 of 24...

Page 24: ...tep 1 to convert values not expressed as R ii For multiple layers add R values of each layer to determine overall R value 3 If the overall R value of the system is greater than the R value of the spec...

Reviews: