![Focal Point NEBRASKA SURROUND WALNUT VENEER Assembly & Installation Manual Download Page 2](http://html1.mh-extra.com/html/focal-point/nebraska-surround-walnut-veneer/nebraska-surround-walnut-veneer_assembly-and-installation-manual_2313943002.webp)
A S S E M B L Y I N S T R U C T I O N S
GB IE
1.0 IMPORTANT NOTES
Section
1.0
2.0
3.0
4.0
5.0
6.0
7.0
Contents
Important notes
Tools required
Hardware & parts list
Assembly
Installation
Cleaning/ finishing
Guarantee - terms and conditions
Page No.
2
2
2
3
5
5
5
2.0 TOOLS REQUIRED
CODE
NAME
FIGURE
QUANTITY
A
WOOD
DOWELS
(8X20mm)
19PCS
B
CAM LOCKS
(15X9mm)
12PCS
C
CAM BOLTS
(6X30mm)
12PCS
D
WOOD
SCREWS
(8X25mm)
13PCS
E
WALL
SCREWS
(8X38mm)
2PCS
F
WOOD
SCREWS
(3X20mm)
4PCS
G
WALL PLUGS
(6X25mm)
2PCS
3.0 HARDWARE & PARTS LIST
CODE
NAME
FIGURE
QUANTITY
①
TOP PANEL
1PC
②
FRONT PANEL
1PC
③
LEFT SIDE
LEG
1PC
④
RIGHT SIDE
LEG
1PC
⑤
INSIDE LEGS
3PC
⑥
LEFT SIDE
PANEL
1PC
⑦
RIGHT SIDE
PANEL
1PC
To ensure safe and stable installation:
1. The assembled Fire Surround must be fixed / secured to wall.
2. The wall must be sturdy and in good repair.
3. Some walls require alternative fixings (not included).
4. When drilling into the wall, check for hidden pipes and cables.
Cross head screwdriver PZ2 (3 inches in length or greater)
Drill, 6mm and a 2mm suitable drill bit
Pencil
Tape measure
H
MIRROR
PLATES
(45X43mm)
2PCS
I
GLUE
(10g)
1PCS
2
© 2017 Focal Point Fires plc.