![FND KLR-28LA Manual Download Page 8](http://html1.mh-extra.com/html/fnd/klr-28la/klr-28la_manual_2313244008.webp)
5.
Installation Guide
The machine must be placed on a firm horizontal surface.
Avoid placing the machine at any angles or may result in
excessive noise during operation.
Ensure a minimum gap of 200 mm between machine and walls to
allow sufficient cooling and ventilation.
Leave the machine in its final position for 4 hours before turning the
power on. This will allow for optimum operation.
The time required to produce a full tank of water is dependent on the
relative humidity of the room. At
60% relative humidity, it will take 4-5
hours to fill the collection tank within the machine.
It is recommended to then drain the collection tank for first time use or if
the machine has been switched off for more than 2 days.
Ensure the machine is positioned with enough ventilation.
HYDROLOGIC-AWG.COM