FMUSER INTERNATIONAL GROUP INC.
广州市汉婷生物技术开发有限公司
10
/
57
Connecting communication port (if it is necessary)
3.2.1 Device’s installation flow chat illustrated as following
3.2.2 Environment Requirement
Item
Requir ement
Machine hall spac e
W hen us er install mac hine frame array in one
machine hall, the distanc e between 2 row of
machine frames should be 1.2~1.5m and the
distanc e to wall should be no less than 0.8m
。
Machine hall floor
Electric Is olation, D ust Free
Volume
rec eptivity
of
ground
anti-static
material:1
×
10
7
~1
×
10
10
Ω
,Grounding
current
limiting resistanc e: 1M
Ω
。
Floor bearing should be greater than 450Kg/m
2
。
Environment
temperature
5~40
°
C sustainable
,
0~45
°
C short time
installing air-c onditioning is rec ommended
Relative H umidity
20%~80% sustainable 10%~90% short time
Pressure
86~105KPa
Door & window
Installing rubber strip f or s ealing door-gaps and
dual level glass es f or window
W all
It c an be c overed with wallpaper, or bright less
paint.
Fire protection
Fire alarm s ystem and extinguisher
Power
Requiring devic e power, air-c onditioning power
and lighting power are independent to eac h
other. D evic e power requires AC power 220V
50H z. Pleas e c arefully check bef ore running.
3.2.3 Grounding Requirement
All function modules’ good grounding designs are the base of
reliability and stability of device. Also, they are the most
Connecting
Grouding
Wire and
Power
Cord
Acquisition
Check
Fixing
Device
Setting
Parameter
Running
Device