INSTRUCTIONS MANUAL

MEASUREMENT SOLUTIONS

We put you first.
And keep you ahead.

DISASSEMBLY AND CLEANING POST TESTING

 

CAUTION: When using water as a test medium a  
water/rust inhibitor solution must be used in order  
to prevent rusting after testing. Use 5% solution 
QC1208, or equivalent (Ex. .5 oz./gallon = 500-gallon 
tank ~2 gallons QC1208).

 
After successful test (if water is used), the following must  
be completed.

1.  Drain thoroughly. 

2.  The measuring tube housing, stators etc. must be  
   cleaned and dried by means of hot air or high-velocity  
   air blow off, after disassembly.

   a.  Remove the Internal Parts Kits

  

    i.  Reference  Bulletin 

MN02010

 for detailed  

 

     instructions.

   b.  Remove all the fluid from the inside of the outer  
       housing; the carbon steel housing must be dried  
  

    thoroughly.

   c.  Disassemble the Internal Parts Kits

  

    i.  Reference  Bulletin 

MN02010

 for detailed  

 

     instructions.

   d.  Internal Parts Kits Components – Once  
       disassembled clean and dry all surfaces of  
       residual fluid. In addition, each bearing should  
       be cleaned with a dry, clean, lint-free cloth. 

   e.  If the meter is being placed in long term storage,  
       refer to step 1b of the Long Term Storage section  
       of this document prior to reinstalling the internal  
       parts kit assembly.

   f.   Once all components are clean and dried,  
       reassemble as appropriate.

  

i.   Reference  Bulletin 

MN02010

 for detailed  

  

    instructions.

   ii.  After assembling the IPK, carefully rotate the rotor  
       in the measuring tube. If the rotor doesn’t rotate  
       freely, inspect all parts for proper alignment.

STORAGE

1.  If the meter is not installed as soon as it is received,  
   it is recommended that the complete meter assembly 
   be stored under protective cover in an environmentally 
   controlled area (humidity is greatest concern). Use 
   original factory packaging.

2.  Store the turbine meter in a safe area to avoid damage. 
   Protect the housing and components from external 
   impact of any kind. 

3.  Seal the inlet and outlet flanges of meter housing with 
   flange covers to prevent intrusion of contaminants.

4.  Examine housing for damage before its commissioning. 

 

MVTM Turbine Meter
Cleaning and Storage
Procedure

Bulletin MN02016 Issue/Rev. 0.0 (1/17)