Fluid Management
®
6
ASSEMBLY & INSTALLATION
ASSEMBLY &
INSTALLATION
MOUNTING THE CANISTERS
The Harbil NSC80 requires only the simple fastening of the individual
canisters to the turntable. The canisters must be mounted in the proper order.
Do not fill the canisters before that are mounted.
It is critical that the crank be captured by the bushings that are part of the
star wheel assembly. For machine configurations containing less than 12
canisters, hole plugs are provided (FM P/N 25956) to cover the unused
canister positions.
1. Unplug the machine before installing canisters.
2. The drive star rotates freely around the drive cam mechanism under the
turntable. Rotate drive star with fingers (or other object) inserted through
the large holes. Rotate until all of the nylon drive star bushings are
visible through all of the large holes. (See Figure 1)
ALL
BUSHINGS
VISIBLE
BUSHING
NOT
SHOWING
CORRECT
NOT
CORRECT
Figure 1 BUSHING ALIGNMENT
3. Insert two screws into the threaded holes on bottom of the canister.
Allow about 1/8”-1/4” of thread (3-5 threads) to be exposed, as shown in
Figure 2 on page 7.
4. Align the screw heads with the button holes on the turntable for the front
canister position and rotate the agitation blade until the agitation crank is
aligned with the nylon bushing. (Figure 3 on page 7)
5. Lower the canister into position, assuring that the agitation crank is
captured by the nylon bushing and that the screw heads pass through the
Summary of Contents for HARBIL NSC50
Page 4: ...Fluid Management 4 NOTES...