FDS Setup manual for SPEED 2 ... page 2 of 2
6
3. Install FDS-Endline
Pull the thick grey FDS-Endline through the ring at the
end of your depower leader line.
Finally, connect the big steel ring to the end of the FDS-Endline, then the ring through the sleeve of the
line, this way:
Please check the whole setup for correct function in light wind
before you go out! Instruction videos and handling tips can be
found on flysurfer.com.
Fly safe!
Pull it also through the hole in the bar and
the steel ring at the Chickenloop.
First take the 20cm short FDS-Weakpointline
and connect it to the 21m FDS-Line [white].
Use the ELC to do this, then tighten the
connection [1.- 3.].This way, the ELC works as
a stopper to prevent the bar from slipping all
the way up to the kite.
This step is very
important!
Please ensure that
you connect the ELC
correctly! Otherwise the FDS may fail when
deployed!
1. 2.
3.
Ho to connect the ring in
four steps:
1. 2. 3. 4.
1.
2.
Then connect the Weakpointline with the thick FDS-
Endline [1.- 2.].