Assembly and installation
Operating instructions VISCOPOWER
95
E
N
G
L
IS
H
6.2 Assembly between progressive cavity pump and motor
Connecting the progressive cavity pump F 570 and motor
1. Place the motor at the centring at the gearbox.
2. Tighten the union nut.
The progressive cavity pump and the motor are now connected to each other.
Summary of Contents for F 570
Page 133: ......
Page 199: ...Anhang Appendix Annexe...
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ...FB 10 58083001_02_1122 100 DEF...