KIT-EMM300
Instructions
4
Set Up
To set up the Product:
1. Connect the CAN bus cable to the Docking Station and to the CAN bus connector on the rear panel of the
Pressure Controller. See Figure 2.
2. Connect the Test Leads from the EMM300 Input Terminals to the DUT connections, observing polarity.
3. Connect mains power to the Docking Station.
4. Ensure that the EMM/HART indicator shows on the lower half of the main screen on the Pressure Controller.
5. Connect the RS232 cable to your computer (optional).
6. Connect the DUT pressure connection(s) to the Pressure Controller TEST port, or to an accessory connected to
the TEST port (CPS, SPLT, Test Station, for example).
015504001
100-240 VAC
47-63 Hz
100W MAX
T2A 250V
SERIAL NUMBER
FLUKE CORPORA
TION
6920 SEAWAY BL
VD., M/S 143F
EVERETT, WA 9820
3 USA
www.flukecal.co
m
ASSEMBLED IN US
A
SWITCH TEST
30V MAX
SYSTEM
DRV1
DRV2
USB
LAN
IEEE-488
RS-232
DRV3
DRV4
MWP
48 MPa
ifh03.eps
Figure 2. Controller Connections